Structure Type: built works - public buildings - schools; built works - social and civic buildings - community centers
Designers: Corbett, Mario F., Architect (firm); Perkins, Mac D., Structural Engineer (firm); Mario Francis Corbett (architect)
Dates: [unspecified]
A concrete frame carried the structural load of the building; reinforced adobe walls carried only their own weight. Works Progress Administration labor erected the building. Mac D. Perkins served as the Structural Engineer.
The building cost a miniscule $2.25 a square foot.
PCAD id: 11135