Article Title:
East Vs. West
Publication:
Seattle Times
Author:
Garber, Andrew
Lindblom, Mike
Publication Type:
Newspaper
Date:
02/12/2008
Pages:
A1, A9
Illustrations:
ext photos, sects
Notes:
"The core issue in the 520 Bridge fight is whether a new six-lane bridge--to open in 2018--could eventually be widened. In the Legislature, that has turned into a debate over the size of the pontoons that would be used to float the bridge across Lake Washington." (p. A1) The cost of the bridge was set at $4 billion in 01/2008.
PCAD id:
8105