Structure Type: built works - infrastructure - transportation structures
Designers: [unspecified]
Dates: [unspecified]
The Puyallup Tribe contracted in May 2007 with SSA Marine, the largest American shipping terminal operator, to build a $300 million container ship terminal on 180 acres fronting the Blair Waterway.
PCAD id: 8994