Structure Type: built works - infrastructure - transportation structures - dams
Designers: [unspecified]
Dates: [unspecified]
This first Fremont Dam was built while a ship canal was dug between Lake Washington and the Ballard Locks. This was completed in 1916.
The dam was demolished when in broke open, 03/13/1913.
PCAD id: 6583