Structure Type: built works - public buildings - schools
Designers: Daly Genik, Incorporated, Architects (firm); Koh, William and Associates, Incorporated, Structural Engineers (firm); Lehrer, Mia, and Associates, Landscape Architects (firm); Sully-Miller Contracting Company, Building Contractors (firm); Kevin Daly (architect); Robert Edmonds ; Christopher Genik (architect); William Koh (structural engineer); Earl B. Miller (building contractor)
Dates: [unspecified]
A school built for an Episcopalian priest, Philip Lance, in the MacArthur Park section of Los Angeles, CA; the new school, serving 260 K-5 students, was built in a remodeled mini-mall; the building cost a meagre $1.1 million, and contained 11,300 square feet; Kevin Daly was the Principal-in-Charge of the project; Chris Genik acted as a consultant; Robert Edmonds was the Daly, Genik Job Captain; Scott Allen, Alice Park, George Tolosa, and Jared Ward made up the project team; designed for 260 students in 2001, 1115
The elementary school was housed in a renovated mini-mall;
PCAD id: 603