Structure Type: built works - public buildings - schools - high schools

Designers: Jenkins and Jones, General Contractors (firm); Seattle Public Schools, District Architect, Blair, Edgar (firm); Edgar Blair (architect); Jacob Elshin (muralist)

Dates: [unspecified]

3000 California Avenue SW
West Seattle, Seattle, WA 98116-3302

OpenStreetMap (new tab)
Google Map (new tab)
click to view google map
Google Streetview (new tab)
click to view google map

Building Notes

The Engineering News reported in its issue of 10/05/1916: "Wash., Seattle--High School--School Bd. let contract West Seattle High School to JENKINS & JONES, Hinckley Bldg., $196,600." (See "Buildings: Bids in and Contracts Awarded," Engineering News, vol. 76, no. 14, 10/05/1916, p. 182.) Jenkins and Jones served as the building contractor for the West Seattle High School.

Muralist Jacob Elshin painted a mural triptych for the school's main hallway in 1939; it was vandalized in the 1970s, stored in an art classroom, and restored to a new location in the school library in 2002;

Alteration

The high school experienced a renovation and an addition completed in 09/2002; the restoration cost was $53.2 million;

PCAD id: 5309