Structure Type: built works - commercial buildings - banks (buildings)
Designers: [unspecified]
Dates: constructed 2009-2010
1 story
This branch opened in late 03/2010.
This was the second bank branch in the Wells Fargo chain to have been LEED Gold certified. A branch in Manhattan Beach, CA, opened in 2009, was the first.
PCAD id: 425