Structure Type: built works - commercial buildings - restaurants
Designers: Miller Hull Partnership, LLP (firm); Robert E. Hull (architect); David Edward Miller (architect)
Dates: constructed 1991
1 story, total floor area: 10,000 sq. ft.
Overview
Miller Hull Partnership designed the Cafeteria 9-12 for the Boeing Company, its first corporate commission, in 1991. The cafeteria served Boeing's Developmental Center complex in Tukwila, WA, just east of the Duwamish River.
Building History
By 2010, Boeing had closed this cafeteria. (See Washington, Department of Ecology, Lower Duwamish Waterway RM 4.3 to 4.9 East (Boeing Developmental Center) Source Control Action Plan, December 2010, Publication #10-09-135, [Olympia, WA: State of WA, 2010], p. 13.)
PCAD id: 24386