Structure Type: built works - public buildings - schools - middle schools
Designers: Skanska USA Building Incorporated (firm)
Dates: constructed 2015-2016
2 stories, total floor area: 100,000 sq. ft.
Overview
This second middle school serving the Alderwood neighborhood of Lynnwood replaced a 1950s school designed by the Seattle firm of Waldron and Dietz. Work began on the new middle school on a portion of the existing site, with with commencing in 2015 and was largely completed by 11/2016. Occupancy began in 01/2017.
PCAD id: 20949