Structure Type: built works - public buildings - schools - university buildings
Designers: Integrus Architecture, PS (firm); Shea Graham Construction (firm)
Dates: constructed 2003-2005
4 stories
Construction began on the Computing and Engineering Building in 09/2003 and was finished by 09/2005, when classes began that year. Constructed of a reinforced steel frame, the four-story building contained classrooms, labs for Cyber Security, Hardware, Software, Digital, Materials, Thermal Dynamics, Fluid Mechanics, Robotics, Multimedia, and Visual Communication, a machine shop with computer controlled machining equipment, and a "Gallery of Technology," a display of contemporary technology in action. (See Eastern Washington University, "Halls, Buildings and Facilities,"
Seattle-based Integrus Architecture designed the Computing and Engineering Building at Eastern Washington University; Shea Graham Construction served as the General Contractor.