Structure Type: built works - industrial buildings - factories; built works - infrastructure
Designers: [unspecified]
Dates: [unspecified]
On 01/06/1914, the McAteer Shipbuilding Company announced that it would begin construction of shipbuilding docks on the newly rechanneled Duwamish River at a cost of $50,000.
PCAD id: 18844