Structure Type: built works - recreation areas and structures - swimming pools
Designers: [unspecified]
Dates: constructed 1988-1989
1 story
The Rose Bowl Aquatic Center opened on the site of the Brookside Plunge in Pasadena, CA. The facility cost $6.5 million to build, $4.5 of which was obtained in a loan from the City of Pasadena, and $2 million from private donors.
PCAD id: 16840