Structure Type: [unspecified]
Designers: [unspecified]
Dates: constructed 1925-1926
The Los Angeles architecture firm, Meyer and Holler, collaborated with a local architect, R.B. Kelley, on the design of the Aztec Theatre in San Antonio, TX.
At its opening in 1926, the Aztec contained approximately 3,000 seats.
The theatre was divided into a three-theatre complex before 1981.
PCAD id: 15337