Structure Type: built works - industrial buildings - industrial parks
Designers: [unspecified]
Dates: [unspecified]
This industrial park was being built in 1962, when Abbott Laboratories and the Minnesota Mining and Manufacturing Company (3M), started new buildings there. The General Electric Corporation was the first large tenant to move in before 09/1962. Puget Western, Incorporated, a subsidiary of Puget Sound Power and Light Company, developed the park, .
PCAD id: 15108