Structure Type: built works - infrastructure - transportation structures - bridges
Designers: [unspecified]
Dates: constructed 1980-1982
This six-lane bridge replaced the Dumbarton Bridge #1, opening 10/1982. The $200 million bridge had a central span measuring 340 feet long and 85 feet above the water's surface.
This bridge was built 90 feet to the north of the previous span.
PCAD id: 13338