Structure Type: built works - public buildings - schools - high schools
Designers: [unspecified]
Dates: [unspecified]
The Redmond High School installed a geothermal heating/cooling unit in 2003; a Seattle Times report of 08/04/2008 indicated that the Lake Washington School District saved $66,000 a year by this installation.
PCAD id: 12612