Structure Type: built works - industrial buildings - factories; built works - military buildings; built works - research structures - laboratories
Designers: [unspecified]
Dates: constructed 1943-1963
Construction of this large nuclear manufacturing facility began in 03/1943. By 08/1945, the Hanford Engineering Works had 554 buildings on its site, with 3 nuclear rectors--105-B, 105-D, and 105-F--and 3 plutonium processing units--221-T, 221-B, and 221-U.
PCAD id: 12593