Structure Type: built works - industrial buildings - warehouses
Designers: [unspecified]
Dates: [unspecified]
The prestressed concrete Vierendeel trusses used to support the roof of this warehouse failed when construction was 90% finished in 1952. A controversy arose between the designer of the truss and the contractor who put it in place as to whose fault it was.
PCAD id: 11168