Structure Type: built works - public buildings - schools - high schools
Designers: [unspecified]
Dates: [unspecified]
In 09/1923, this high school accommodated 800 students, up from the figure of 419 in 1921. In one semester, the school superintendent expected this figure to surpass 1,000. The school district considered a bond issue in 09/1923 to build additional buildings to handle the influx.
PCAD id: 10261