AKA: Stouffer-Madison Hotel, Downtown, Seattle, WA; Marriott International, Incorporated, Marriott Renaissance Seattle Hotel, Downtown, Seattle, WA

Structure Type: built works - dwellings -public accommodations - hotels

Designers: Callison Architecture, Incorporated (firm); Hedreen, R.C., Company, Developers (firm); Anthony Callison (architect); Richard Castle Hedreen (developer)

Dates: constructed 1981-1983

27 stories

515 Madison Street
Downtown, Seattle , WA 98104

OpenStreetMap (new tab)
Google Map (new tab)
click to view google map
Google Streetview (new tab)
click to view google map

Seattle architect Anthony Callison (1932-1988) served as Partner-in-Charge for this project. When constructed, the Madison Hotel #2 stood 27 stories tall and contained about 575 rooms; construction cost was set at $45 million when the structural framing topped out in 06/1982. Completion at this time was targeted for 06/01/1983.

The Madison Hotel #1 stood at 1019 Madison Street in Seattle, WA. As the Stouffer Madison the telephone number was 800.468.3571; as the Renaissance Seattle Hotel its telephone number was 206.583.0300 (2012).

PCAD id: 8601